Construction site shutdown planning checklist
Leave the site safe and secure if work stops.
- Version
- 2026.1
- Last updated
- October 24, 2026
Prepared by ArtBuild to help you organise your paperwork. It is general information, not legal advice, and it has not been reviewed by a lawyer. Check the rules for your province or territory before you act.
Part of the Non-Payment and Work Suspension Kit: start with its guide, and download the whole kit there.
Prepare a site specific protection plan
Use this checklist to organize a qualified site team before an authorized interruption. It is not an engineering design or a machine-isolation procedure. Follow the site’s approved procedures and applicable safety requirements; preserve essential protection and emergency access.
- Site project date and proposed interruption
- Site supervisor safety lead and emergency contact
- Affected zones and work that continues
- Identify unstable work, excavations, openings, temporary supports and access hazards for qualified assessment.
- Identify weather exposure, drainage, freezing risk and materials requiring protection.
- Confirm essential services, fire protection, security and emergency access responsibilities.
- Assign equipment-specific hazardous-energy control to trained authorized personnel under approved procedures.
- Record who inspects temporary works and what triggers an additional inspection.
- Coordinate with occupants neighbouring operations and other trades.
Record handover and continuing duties
| Area / system | Protection or monitoring required | Responsible person | Evidence / next check |
|---|
- Photograph site conditions and label locations before handover.
- Inventory tools materials and hired equipment with ownership and custody.
- Record keys access permissions alarms and emergency arrangements securely.
- Confirm waste hazardous materials and stored products are managed by competent personnel.
- Record restrictions and unfinished work clearly for the custodian.
- Agree inspection frequency and response to weather incidents or intrusion.
- Plan a qualified readiness inspection before restart.
- Unresolved hazard and escalation owner
- Custodian acceptance and limitations
- Approved plan reference and briefing record
- Next inspection and communication route
Do not remove supports, isolate essential systems or release equipment controls using this generic checklist alone. Site-specific authorized procedures govern those actions.
Before you act: this document is general information prepared by ArtBuild to help you organise facts and paperwork. It is not legal advice and has not been reviewed by a lawyer for your situation. Rules differ by province and territory and change over time. Check the official source for your project, and for deadlines, liens, court or insolvency steps, speak with a lawyer licensed where the project is located.