Cancellation site condition and handover report

Record site condition and handover when you leave.

Version
2026.1
Last updated
October 24, 2026

Prepared by ArtBuild to help you organise your paperwork. It is general information, not legal advice, and it has not been reviewed by a lawyer. Check the rules for your province or territory before you act.

Part of the Contract Cancellation and Recovery Kit: start with its guide, and download the whole kit there.

Download PDF Download editable Word (.docx)

Record the site at cancellation

Use a joint inspection where feasible. Record observations and disagreements separately. This report documents condition and custody; it does not automatically accept workmanship, transfer title or release either party.

Site project and contract
Inspection date time weather and attendees
Cancellation instruction and affected areas
Outgoing and receiving representatives
Access authority and safety plan
Area / work itemCompleted and unfinished conditionPhoto IDRestriction
Immediate protective work and owner
Disputed observations and evidence

Account for property and continuing duties

Item / serialOwner and evidenceLocation / conditionCustodian
Continuing taskResponsible personFrequency / triggerContact
Keys and controlled access record
Utilities alarms and emergency arrangements
Materials returned or retained and authority
Permits inspections and notifications
Next inspection date and owner

Store access codes separately in a secure attachment. Record hired equipment distinctly from owned equipment. Removal or transfer needs proper authority; a signature acknowledging this report is not a blanket release.

Confirm the scope of acknowledgement

Outgoing name role signature and date
Receiving name role signature and date
Acknowledged facts and express reservations
Missing records or disputed inventory
Photo index and attachments
Copies delivered to and method
  • Every identified hazard has a responsible person.
  • Unfinished work and weather protection are recorded.
  • Ownership and custody are not conflated.
  • The record is linked to the final account without duplicate charges.
  • Any release or transfer wording has separate authorized review.

Fictional example: unused cabinets remain in a locked room while their return is discussed. Record quantity, ownership evidence, condition and custodian. Do not infer that possession decides who pays or who owns the cabinets.

Jurisdiction-specific legal and site-safety verification required. This report supplies no engineering shutdown procedure.

Before you act: this document is general information prepared by ArtBuild to help you organise facts and paperwork. It is not legal advice and has not been reviewed by a lawyer for your situation. Rules differ by province and territory and change over time. Check the official source for your project, and for deadlines, liens, court or insolvency steps, speak with a lawyer licensed where the project is located.

All Construction Contracts

ArtBuild template All of Canada

Completed Work and Cost Record

Record work completed and its cost. Part of the Construction Deposits and Refunds kit.

Version 2026.1

Protect your construction business. Create your free ArtBuild Business Hub account.

With a free ArtBuild Business Hub account you can save the documents you generate, reuse your business details on every form, and find them again later. Everything on this page stays free without an account.

Create a free account